
Kitchen Remodeling in NYC
Illyrian Group Corp remodels kitchens for NYC homeowners and co-op/condo owners, from cabinetry and countertop swaps to full layout changes that open a kitchen to the rest of the home.
- Layout Changes
- Cabinetry & Countertops
- Gas & Plumbing Coordination
- Free On-Site Estimate
A kitchen remodel touches more trades than almost any other room in an NYC home: plumbing, gas, electrical, cabinetry, countertops, and tile all have to land in the right sequence, on the right day, in an apartment where staging space is limited. Illyrian Group Corp runs that sequence as the kitchen remodeling contractor on the job, whether you're swapping cabinets and counters on the existing footprint or opening the kitchen up entirely into an adjacent room.
Most people searching "kitchen remodeling near me" are really looking for one of two project types once they talk to us: a like-for-like refresh that keeps plumbing and gas where they are, or a layout change that relocates a sink, range, or wall. The second category costs more and takes longer, mainly because of permit review and co-op or condo board sign-off, not because the physical work itself is dramatically harder. We tell you which category your project falls into at the walkthrough, before you commit to a design.
Kitchen Remodeling Cost in NYC
General NYC market ranges to help you budget, not a quote for your specific project. Your exact price depends on scope, condition, and finish level, confirmed in a free written, itemized estimate after an on-site walkthrough.
What moves your price up or down
- Whether plumbing or gas lines relocate
- Cabinetry tier (stock, semi-custom, or custom)
- Countertop material (laminate, quartz, or natural stone)
- Appliance package tier
- Ventilation and exhaust routing
- Co-op or condo board approval for gas work
How Much Does a Kitchen Remodel Cost in NYC?
A full NYC kitchen remodel typically runs $35,000 to $70,000, with small refreshes starting around $20,000 and high-end layout changes exceeding $150,000. The biggest cost drivers are whether plumbing or gas lines move, cabinetry tier, and countertop material. Every estimate from Illyrian Group Corp is written and itemized after an on-site walkthrough, not a phone quote.
Our Kitchen Renovation Process
Walkthrough & Design
We assess the space, discuss layout goals, and help you select cabinetry and materials.
Written Proposal
An itemized quote covering scope, materials, and a project-specific schedule before any work starts.
Permits & Board Approval
We file DOB permits and prepare co-op or condo alteration paperwork where the scope requires it.
Demo & Rough-In
Demolition followed by plumbing, electrical, and gas coordination for the new layout.
Install & Walkthrough
Cabinetry, counters, and appliance hookup, closed out with a documented punch list walkthrough.
What's Included in a Kitchen Remodel
Included in scope
- Demolition of existing cabinets, counters, and flooring
- Cabinetry and countertop templating and installation
- Plumbing, electrical, and gas rough-in coordination
- Backsplash tile installation
- Standard appliance hookup
- Painting and finish work
- Final cleaning and punch list walkthrough
Priced separately
- Appliance purchase cost, unless a package is selected
- DOB permit filing fees
- Custom cabinetry beyond the standard allowance
Why Property Owners Choose Illyrian Group Corp
One Point of Contact
One project lead from the first walkthrough to the final punch list, not a rotating cast of subs.
Written, Itemized Quotes
Every estimate is written and itemized before work starts. No verbal-only pricing, no surprise change orders.
Permits Handled for You
We manage the Department of Buildings permit process for scope that requires it, so your project stays on schedule.
1-Year Workmanship Warranty
Every kitchen remodel comes with a 1-year workmanship warranty covering our installation work. Cabinetry, countertop, and appliance manufacturer warranties pass through to you separately, and we help you register them once the project closes out.
Thinking about opening up your kitchen?
We'll evaluate the wall and give you a real scope and price.
Planning Around Appliance & Material Lead Times
Cabinet and countertop lead times are usually the longest part of a kitchen remodel timeline, often longer than the construction itself. Stock cabinetry can ship in 2-3 weeks; semi-custom and custom lines commonly run 8-12 weeks. Stone countertops need a template of the finished cabinet run before fabrication starts, which adds another 1-2 weeks. We order cabinetry and stone as soon as your design is finalized, so the material arrives right as the space is ready for it instead of sitting idle waiting on either the crew or the materials.
Cabinet and Countertop Options by Budget Tier
Cabinetry and countertop material are the two biggest line items in a kitchen budget. Here's roughly what each tier gets you:
Standard
Stock cabinetry in a limited set of finishes and laminate countertops. The fastest lead time (2-3 weeks) and the lowest cost per linear foot, a practical choice for a straightforward refresh on the existing footprint.
Mid-Range
Semi-custom cabinetry with a wider door-style and finish selection, paired with quartz countertops. Most full NYC kitchen remodels land in this tier. Cabinetry lead time typically runs 8-12 weeks.
High-End
Custom cabinetry built to the kitchen's exact dimensions, with natural stone countertops like marble, granite, or quartzite. Longest lead times, but the layout can flex around columns or vent stacks that stock cabinetry can't.
How We Structure Payment
Payment is structured around project milestones rather than a large deposit up front: an initial payment to secure your slot and order materials, progress payments tied to demo and rough-in, and a final payment due after the punch list walkthrough is signed off. Exactly when that first payment lands depends on your property: private homes can move straight from signed proposal to materials order, while co-ops and condos hold it until board or building management approval clears, so you're never carrying a materials deposit through a review that could still change the scope. The full schedule for your specific borough and property type is spelled out in your written proposal before you commit to anything.
Kitchen Remodeling in Every Borough We Serve
Frequently Asked Questions About Kitchen Remodeling
Do I need a permit to remodel my NYC kitchen?
It depends on scope. Cosmetic work like cabinets, counters, and finishes generally doesn't require a DOB permit. Moving gas lines, plumbing, or walls does. We determine what your specific project needs during the walkthrough and file the paperwork if it's required.
Can you open up my kitchen to the living room?
In many cases, yes, if the wall isn't load-bearing, or with an engineered beam if it is. We coordinate structural evaluation, DOB permits for load-bearing changes, and the construction work as one project.
How long does a kitchen remodel take?
A standard kitchen remodel with the existing layout takes about 4-6 weeks. Projects that relocate plumbing, gas lines, or walls run 6-8 weeks or more, largely driven by cabinet and appliance lead times, which we account for in your schedule up front.
Do you install cabinets and countertops or just the construction work?
We handle the full scope: demo, rough plumbing and electrical, cabinet installation, countertop templating and install, backsplash tile, and appliance hookup coordination. You get one contractor managing the whole kitchen, not separate crews for each piece.
Explore More Services
Ready to Remodel Your Kitchen?
Get a free, written estimate from Illyrian Group Corp.